Projects
Click on a project category below to view a project:
-
RUVU
Location: Tanzania
Dodsal Group, through its subsidiary Dodsal Hydrocarbons and Power (Tanzania) Pvt. Ltd. acquired the whole hydrocarbon concession OF THE RUVU ONSHORE BLOCK in 2007 by signing a Production Sharing Agreement (“PSA”) with the Ministry of Energy and Minerals (“MEM”) and Tanzania Petroleum Development Corporation (“TPDC”) for the exploration and production of hydrocarbons.
Dodsal invested significant time and capital for unlocking the hydrocarbon potential of the Asset through implementation of systematic Oil/Gas industry exploration work flows in Ruvu Block.
Dodsal completed technical evaluation of 3,546 LKM Legacy seismic data & 2 Nos. Legacy Wells.
Dodsal further acquired, processed, and interpreted 1,421 LKM of new 2D seismic data, carried out satellite imagery studies and collected 900 geochemical soil samples to establish presence of working petroleum system in the block.
Dodsal drilled 3 Nos. Exploration Wells (Year 2015) and well samples were analyzed by leading international Labs / Agencies (Viz. Core Labs, RPS Energy, CGG, Lomond Associates etc.) to establish presence of working petroleum system in the block.
Reports of above studies confirmed presence of significant hydrocarbon resources, with estimates varying between 5.5 to 7.5 TCF (Trillion Cubic Feet), which makes Ruvu block a single mega on-shore block in Tanzania.
Quality of Gas is mainly Methane, with little impurities i.e. no treatment facilities are required.
-
ITINGI
Location: Tanzania
Dodsal Resources and Mining Itingi (Tanzania) Pvt. Ltd., a wholly owned subsidiary of Dodsal Resources, secured a concession from the Ministry of Energy and Minerals, Government of Tanzania, for mining at a location approximately 1,250 km South-West of Dar es Salaam, Tanzania. Preliminary findings conducted at the site, which is approximately 101 sq. km, show potential for multi-metals. Dodsal aims to complete exploration by 2019 and commence mining by 2020.